The keys-to-move-in checklist for a new condo
Everything between collecting the keys to a new condo and moving in, in six stages and in the order it should happen. Tick each step as you go, then print the list or send it to whoever is planning this with you.
- 24 monthsDefect liability period on a new unit bought from a developer, from the date of vacant possession.
- In writingApproval from your building's management (JMB or MC), before any renovation work starts.
- 10 to 15%Of the cost of the works, held back as contingency.
The first two are law. The third is a planning figure, not a rule.
The checklist
From key collection to move-in, in six stages
- Law From legislation, the standard sale and purchase agreement or the local authority. Last checked on 25 November 2026.
- Your building decides A house rule. Ask your management office.
- Steps with no label are practical advice.
Your ticks cannot be saved in this browser right now. The full checklist is below: open each stage to read it, and print it from your browser menu.
Stage 1: Day one
Before and on key-collection day
Vacant possession, when the developer hands the empty unit over to you, starts the clock on your defect period. Leave the handover with the dates, readings and papers you will need later.
-
See when the 24 months end
Add the date to see when the 24 months end. It stays on this device.
Date of vacant possession: 24 months from then:
0 of 8 done Next: Defects first
Stage 2: Before any renovation
Defects first
Do this before any renovation work starts. The developer is only responsible for defects in its own work, so record them before anything is hacked.
Room-by-room defect inspection checklist
8 areas, 0 of 33 checked 8 areas, 33 checks
A common-sense guide for owners, not a professional inspection. For a formal report, hire a professional defect inspector. If the water or power is not connected yet, come back to those checks once it is.
Bring: phone camera, torch, coin, masking tape, phone charger, pail, floor plan.
Entrance and doors
Walls and ceilings
Floors
Windows and sliding doors
Kitchen and yard
Bathrooms
Electrical points and DB box
Balcony and railings
If a dispute with the developer over defects in a new unit cannot be settled, it goes to the Tribunal for Homebuyer Claims.
0 of 7 done Next: Scope and budget
Stage 3: Before you ask for quotations
Decide what you are doing and what it will cost
Know your scope and your number before anyone quotes. A clear list is what lets you compare two quotations line by line.
0 of 8 done Next: Approvals
Stage 4: Before work starts
Get the approvals
Nothing starts until your management says yes in writing. That often takes 1 to 2 weeks, set by the building, so apply early. Some work needs the local authority as well.
How condo renovation approval works
When we manage a renovation, we handle the management-office application and coordinate the contractors. Ask us on WhatsApp
0 of 8 done Next: Work on site
Stage 5: During the work
While the work is on site
Our planning estimate is about 5 to 8 weeks on site for a new unit fit-out, and about 9 to 15 weeks for a full renovation with bathrooms and flooring. Approvals, deliveries and festive breaks can move the dates.
0 of 8 done Next: Handover and moving in
Stage 6: At the end
Handover and moving in
Close the renovation properly before the furniture arrives. The developer's defect period keeps running after you move in.
0 of 7 done
A planning guide, not legal advice and not a professional inspection. Your sale and purchase agreement, your building's by-laws and house rules, and the local authority's requirements decide in the end. The steps marked Law were last checked on 25 November 2026.
Interior Designer KL · interiordesignerkl.com/new-condo-checklist/ · WhatsApp +60 16-756 4007 · A planning guide, not legal advice and not a professional inspection.
Stuck on a step, or want it handled?
We design your home and manage the renovation, with one point of contact from layout to handover. Tell us which stage you are on and we can tell you what comes next for your unit.
You are on stage 1 of 6: Key-collection day. 0 of 46 done.
Message us on WhatsAppOpens WhatsApp with your stage and the number of steps done filled in. Nothing is sent until you press send. We usually reply within one business day. Privacy notice.
Not a new unit?
If you bought sub-sale instead
Stages 3 to 6 apply as they are. The first two change.
The defect period is different
The 24 months apply to a new home bought from a developer under the standard sale and purchase agreement. A sub-sale purchase is different, so check your agreement. Inspect just as carefully: what you find now is what you are budgeting to fix.
Wiring and plumbing are older
An older unit may need rewiring or new pipework before anything decorative. Rewiring the whole unit and shifting plumbing need approval from both the management and the local authority, so raise them early. Published prices for a full rewire of a condo run from RM3,000 to RM12,000.
The budget is a different size
A full renovation adds every bathroom, new flooring, rewiring and strip-out of old built-ins. In the calculator, a mid-range full renovation of a two-bedroom unit of about 900 sq ft comes to RM70,000 to RM153,000, against RM38,000 to RM91,000 for fitting out a new one. Both are estimates, not quotations.
Bought sub-sale and want it planned before you move in? Message us on WhatsApp.
Questions
New condo questions, answered plainly
What should I do after receiving my new house keys?
Start with paperwork and defects, not with a contractor. Note the date of vacant possession, take the meter readings and photograph the empty unit. Then inspect every room and report each defect to the developer in writing, with photos, before any renovation work starts. After that, settle your scope and budget, get written approval from your management office, and only then let work begin. The checklist on this page follows that order.
What is the defect liability period in Malaysia?
For a new home bought from a developer under the standard sale and purchase agreement, it is 24 months from the date of vacant possession. Defects are reported in writing, and the developer must repair within 30 days of receiving the notice. Sub-sale purchases are different: check your agreement.
How do I report defects to the developer?
In writing, in the way your sale and purchase agreement or the developer's defect form sets out. List each defect with the room, a short description and photos, and keep a copy with the date it was received. The developer must repair within 30 days of receiving the notice. When the repairs are done, check them against your list and report anything missed, again in writing. If a dispute over defects in a new unit cannot be settled, it goes to the Tribunal for Homebuyer Claims.
Can I renovate during the defect liability period?
What matters is the order. The developer is only responsible for defects in its own work, so record them before anything is hacked. Report defects in writing, with photos, before any renovation work starts. You also need written approval from your management (JMB or MC) before work begins.
Do I need approval to renovate my condo?
Yes. Under the standard strata by-laws, written approval from the management (JMB or MC) is required before renovation work starts, and the management may require a deposit and set a completion date. Some work needs approval from both the management and the local authority: building a raised platform or new floor level, relocating external doors or windows, shifting plumbing or sewerage, and rewiring the whole unit. Working hours, working days, contractor passes and lift protection are set by your building's house rules. Our guide to condo renovation approval goes through it step by step.
How much is the renovation deposit?
Each building sets its own. Published examples in the Klang Valley are often RM1,000 to RM5,000, refundable. Ask your management office for the amount, how to pay it and how the refund works before you plan your dates.
How long does it take to go from keys to moving in?
It depends on the scope and on your building. Our planning estimates: about 3 to 6 weeks for design, drawings and quotation, often 1 to 2 weeks for management approval, which is set by the building, then about 5 to 8 weeks on site for a new unit fit-out, or about 9 to 15 weeks for a full renovation with bathrooms and flooring. Approvals, deliveries and festive breaks can move the dates. The renovation timeline planner puts dates on each phase.